
Authored By: Christopher Cain, Vice President and General Manager, Electronic Industrial Products – Keysight Technologies; Gooi Soon Chai, President of Order Fulfillment and Digital Operations, Electronic Industrial Products – Keysight Technologies and Shidah Ahmad, Vice President of Global Manufacturing and Supply Chain – Keysight Technologies

Christopher Cain
Global electronics demand has undergone unprecedented growth in the past year through a macro-economic rebound caused by the acceleration of digital transformation, instigated and sustained by the COVID-19 pandemic and fundamental shifts toward adopting renewable power and electric transportation. The lack of integrated circuits (ICs or “chips”) and other electronic materials to meet this demand has profoundly impacted the electronics supply chain, which some have termed “Chipageddon.”
Huge investments across the electronics supply chain are being made in response to this extraordinary level of electronics demand. Of course, a fundamental response is to increase electronics manufacturing capacity, which is hampered by the time and expense required to build a manufacturing plant or IC “fab.”
Many electronic manufacturers have established a plan to increase the manufacturing capacity of electronics test and measurement solutions, including Keysight. These efforts include improving resilient operations, supplier collaboration, strategic sourcing and value engineering.
- Resilient operations ensure people can safely work, with vaccination programs exceeding 98% of the workforce and safe operational procedures. This includes accelerating the digital transformation of fulfillment, manufacturing, and logistics operations.
- Strategic sourcing is about investing in alternate sources and deep supply-based analytics to squeeze every available part out of the worldwide supply.
- Supplier collaboration escalates when shortages occur and deeply engaged supply chain partners help deliver more components and capabilities.
- Value engineering involves redesigning components or assemblies to retain the existing design’s capability, while substituting the part in short supply with another available part. This is expensive and takes time to properly complete, so reengineering a component or assembly is only applied in the most needful situations.
The COVID-19 pandemic has not only accelerated business and personal digital transformation, but the electronics supply chain and manufacturing digital transformation as well. This ranges from Artificial Intelligence algorithms used to predict component availability to software predicting upcoming manufacturing issues. before tests begin failing to enable actions to be taken before future failures stop the line. Predictive insights are provided by advanced software, such as Keysight Technologies’ PathWave Manufacturing Analytics platform.
Community Response
Like everyone in the global electronics business, Keysight Technologies faces the challenges of obtaining sufficient material to assemble our test and & measurement solutions used in electronics manufacturing. We utilise our four-element plan to address these challenges, but sometimes that is not enough to meet near-term critical demands.
We recently encountered challenges obtaining a modular power assembly in one of Keysight’s most complex manufacturing test solutions. We ensured resilient operations amid the pandemic, applied all efforts towards strategic sourcing and supplier collaboration. We even invested value engineering towards alternative designs, but these efforts were still not converging in time to avoid impacting shipment timeframes needed by our customers.

Gooi Soon Chai
We noted that customers might have units in local repair stocking or underutilised in active use systems. Our systems are expandable so that a system might have up to four of these assemblies, and the system’s current usage might not be using all four installed modular power assemblies.
These modular power assemblies can be replaced after the solution is installed in case of rare assembly failure during operations. We keep a few units in global stocking, and some were redeployed, but that couldn’t meet the high demand of newly manufactured systems. How could we obtain more modular power assemblies to satisfy the near-term need to increase our customer’s manufacturing capacity?
We began a program to help our customers discover underutilised modular power assemblies so that they could be redeployed to a newly manufactured system they had on order. To save additional time, we typically arrange for the new system to ship without these modular power assemblies and install them upon delivery of the system.
“The COVID-19 pandemic has not only accelerated business and personal digital transformation, but the electronics supply chain and manufacturing digital transformation as well. This ranges from Artificial Intelligence algorithms used to predict component availability to software predicting upcoming manufacturing issues. before tests begin failing to enable actions to be taken before future failures stop the line.”
We’ve had several cases where we have been able to ship a new system by postponing the final integration of a critical component available through a nonstandard supply chain. Similar strategies are being used in other complex products, such as automobiles. We have a few cases where Customer A provided modular power assemblies to help Customer B, an extraordinary display of the electronics community stepping up to help each other in times of a crisis.
Customer Reengineering

Shidah Ahmad
At Keysight, we have leveraged our fourth supply chain response of value engineering towards helping our customers reengineer solutions they already have for higher productivity. We assigned our most skilled innovators in product design (R&D) to work with our solutions engineers in sales to assist customers in identifying opportunities for upgrades to existing solution capabilities. They have developed new digital tools that help determine which existing hardware and software upgrades might have the best ROI to improve productivity. We are also benefitting from new insights gained by working intensely with customers, which is already impacting our next generation of new products in development.
An example of this was the discovery at one customer that their systems would benefit from upgrading measurement components to enable faster and more parallel measurements. This could be accomplished sooner than supplying all new plans to expand manufacturing capacity. In fact, in this case, we are providing our latest digital analytics platform to enhance productivity even further. Another example of digital transformation accelerated.
By focusing on the customer outcome of increasing manufacturing capacity, we could select from a more comprehensive set of capabilities, some of which had fewer current supply chain impacts and thus could be provided more quickly.
Conclusion
The power of digital technologies and human innovation is impressive, mainly when applied in a crisis. When we facilitate a community response, solutions happen faster, more efficiently and everyone involved contributes. This has helped transform escalations into partnerships for mutual success. Don’t forget that our customers are our neighbors as well!
“By focusing on the customer outcome of increasing manufacturing capacity, we could select from a more comprehensive set of capabilities, some of which had fewer current supply chain impacts and thus could be provided more quickly.”
Formulating a response to the global supply chain challenges can also be reapplied to your customer outcomes when your products and solutions are part of that supply chain. This algorithm is called recursion in software and is one of the most powerful algorithms available. Re-engineering your customer outcomes, especially by leveraging digital technologies, is an excellent source of innovation and accelerated value creation.
Ensuring the success of our neighbours is an enduring value, and in times of crisis, we must remember to be flexible and innovative in how we deliver that success.


Archive
- October 2024(44)
- September 2024(94)
- August 2024(100)
- July 2024(99)
- June 2024(126)
- May 2024(155)
- April 2024(123)
- March 2024(112)
- February 2024(109)
- January 2024(95)
- December 2023(56)
- November 2023(86)
- October 2023(97)
- September 2023(89)
- August 2023(101)
- July 2023(104)
- June 2023(113)
- May 2023(103)
- April 2023(93)
- March 2023(129)
- February 2023(77)
- January 2023(91)
- December 2022(90)
- November 2022(125)
- October 2022(117)
- September 2022(137)
- August 2022(119)
- July 2022(99)
- June 2022(128)
- May 2022(112)
- April 2022(108)
- March 2022(121)
- February 2022(93)
- January 2022(110)
- December 2021(92)
- November 2021(107)
- October 2021(101)
- September 2021(81)
- August 2021(74)
- July 2021(78)
- June 2021(92)
- May 2021(67)
- April 2021(79)
- March 2021(79)
- February 2021(58)
- January 2021(55)
- December 2020(56)
- November 2020(59)
- October 2020(78)
- September 2020(72)
- August 2020(64)
- July 2020(71)
- June 2020(74)
- May 2020(50)
- April 2020(71)
- March 2020(71)
- February 2020(58)
- January 2020(62)
- December 2019(57)
- November 2019(64)
- October 2019(25)
- September 2019(24)
- August 2019(14)
- July 2019(23)
- June 2019(54)
- May 2019(82)
- April 2019(76)
- March 2019(71)
- February 2019(67)
- January 2019(75)
- December 2018(44)
- November 2018(47)
- October 2018(74)
- September 2018(54)
- August 2018(61)
- July 2018(72)
- June 2018(62)
- May 2018(62)
- April 2018(73)
- March 2018(76)
- February 2018(8)
- January 2018(7)
- December 2017(6)
- November 2017(8)
- October 2017(3)
- September 2017(4)
- August 2017(4)
- July 2017(2)
- June 2017(5)
- May 2017(6)
- April 2017(11)
- March 2017(8)
- February 2017(16)
- January 2017(10)
- December 2016(12)
- November 2016(20)
- October 2016(7)
- September 2016(102)
- August 2016(168)
- July 2016(141)
- June 2016(149)
- May 2016(117)
- April 2016(59)
- March 2016(85)
- February 2016(153)
- December 2015(150)