Authored by: Allison Freedman, Product Marketing Manager at Keysight Technologies.
For the first time in a generation, NASA built a spacecraft to take humans further than they’ve ever gone before. With their Artemis missions, NASA will land the first woman and first person of colour on the Moon and explore more of the lunar surface than ever before.
They are collaborating with commercial and international partners, including Keysight Technologies, to establish the first long-term presence on the Moon. The goal is to use what they learn on and around the Moon to take the next giant leap: sending the first astronauts to Mars.
Testing the Orion Spacecraft
But long before the Orion launched in November 2022 to inspire a new generation, it needed to be tested to make sure it was safe for those on board.
This involved testing all the systems, rockets, equipment, splashdown parachutes and more, as well as the software that monitors and controls the spacecraft.
The Orion cockpit is equipped with three display units, seven switch interface panels, two rotational and two translational hand controllers, and two cursor control devices. The display units utilise a variety of display formats to provide data to the crew for awareness, and action when necessary.
According to NASA, “The Orion displays and controls are designed for an intensive amount of crew interaction both in nominal and off-nominal scenarios. Electronic procedures have been developed for Orion that allow direct interaction with the display formats enabling reduced workload on the crew.”
These procedures efficiently walk the crew through planned tasks, reduce workload, and alert the crew when onboard faults and anomalies occur. In the event of a caution or warning, the displays communicate urgent actions the crew needs to take, ensuring safety for all onboard. These monitors need to be continually tested to ensure they operate without faults.
To conduct such testing, the Rapid Prototyping Lab (RPL) at NASA’s Johnson Space Center along with the University of Texas at Tyler selected Keysight’s Eggplant Test automation solution.
Eggplant Test ensures the Orion’s spacecraft mission control panels operate at 100% when 280,000 miles from Earth.
NASA created exact replicas of these interfaces in a cockpit mock-up at NASA’s Rapid Prototyping Lab to test their software. They use Eggplant to dynamically test the software’s user experience even under simulated highly stressful conditions.
Given the sheer amount of code involved in the software, manually testing of the programs would cause an undue time and resource burden. Eggplant enables Orion’s testers to address this issue, reducing testing time and increasing efficiency while easily accounting for the entire testing lifecycle.
As NASA’s Research Paper ‘Software Verification of Orion Cockpit Display‘ says, “The advantage of Eggplant is that it can be automated to run tests of simulated user interactions on the system under test (SUT) without actual human / physical actions. To do this, Eggplant connects remotely to the SUT and runs programs known as scripts which are a series of commands within a file that is capable of being executed without being compiled.”
“The scripts emulate user interactions on the system such as mouse clicks and keyboard entries. Advanced image recognition technology in Eggplant allows testers the ability to create decision structures that can mimic complex user behaviors. Using the built-in image recognition functions, Eggplant can be scripted to react as the user would to certain events in the software, or to verify if the SUT is acting in accordance with expected results.”
Automating the creation of these Eggplant suites and scripts was implemented as a means of reducing time and increasing efficiency.
Eggplant can be automated to perform several iterations of testing and verification. Test automation results in a quicker turnaround time for NASA’s Rapid Prototyping Laboratory, giving them more time to stress-test their software systems and ensure functionality in the event of a change or update to the underlying software.
The computer in Orion’s service module controls 33 engines and reads over 100 pressure and temperature sensors.
Results and Future Work
One of the main goals in NASA’s testing process was to write modular, re-usable code that can be applied to the different displays and enumerations that may be encountered.
“The framework standardizes the way in which we code and simulate user inputs, and the Common Eggplant Functions can be used repeatedly in tests of other displays.”
Eggplant and its proprietary scripting language SenseTalk, proved to be highly useful tools for automating the testing of the Orion cockpit display simulators.
According to NASA, “Moving forward, we hope to use the tools that we have created to test the other displays and popup types. We also want to run repetitive tests to prove that our scripts are functional and obtaining the correct results. Moreover, this iterative testing will validate reliability and consistency of the Orion cockpit display simulation software performance.” Eggplant Test continues to monitor and test the displays on the Orion for future missions. Artemis 2 is scheduled to launch astronauts around the moon in 2024. If all goes well, Artemis 3 will aim to put boots down near the lunar south pole a year or two later, using a SpaceX Starship vehicle as a lander.
NASA hopes to build a research base in the south polar region, which is thought to harbour lots of water ice. The agency also plans to build a small space station in lunar orbit called Gateway, which will serve as a jumping-off point for missions to the surface, both crewed and uncrewed. The first components of Gateway are scheduled to launch atop a SpaceX Falcon Heavy rocket in late 2024.
Archive
- October 2024(44)
- September 2024(94)
- August 2024(100)
- July 2024(99)
- June 2024(126)
- May 2024(155)
- April 2024(123)
- March 2024(112)
- February 2024(109)
- January 2024(95)
- December 2023(56)
- November 2023(86)
- October 2023(97)
- September 2023(89)
- August 2023(101)
- July 2023(104)
- June 2023(113)
- May 2023(103)
- April 2023(93)
- March 2023(129)
- February 2023(77)
- January 2023(91)
- December 2022(90)
- November 2022(125)
- October 2022(117)
- September 2022(137)
- August 2022(119)
- July 2022(99)
- June 2022(128)
- May 2022(112)
- April 2022(108)
- March 2022(121)
- February 2022(93)
- January 2022(110)
- December 2021(92)
- November 2021(107)
- October 2021(101)
- September 2021(81)
- August 2021(74)
- July 2021(78)
- June 2021(92)
- May 2021(67)
- April 2021(79)
- March 2021(79)
- February 2021(58)
- January 2021(55)
- December 2020(56)
- November 2020(59)
- October 2020(78)
- September 2020(72)
- August 2020(64)
- July 2020(71)
- June 2020(74)
- May 2020(50)
- April 2020(71)
- March 2020(71)
- February 2020(58)
- January 2020(62)
- December 2019(57)
- November 2019(64)
- October 2019(25)
- September 2019(24)
- August 2019(14)
- July 2019(23)
- June 2019(54)
- May 2019(82)
- April 2019(76)
- March 2019(71)
- February 2019(67)
- January 2019(75)
- December 2018(44)
- November 2018(47)
- October 2018(74)
- September 2018(54)
- August 2018(61)
- July 2018(72)
- June 2018(62)
- May 2018(62)
- April 2018(73)
- March 2018(76)
- February 2018(8)
- January 2018(7)
- December 2017(6)
- November 2017(8)
- October 2017(3)
- September 2017(4)
- August 2017(4)
- July 2017(2)
- June 2017(5)
- May 2017(6)
- April 2017(11)
- March 2017(8)
- February 2017(16)
- January 2017(10)
- December 2016(12)
- November 2016(20)
- October 2016(7)
- September 2016(102)
- August 2016(168)
- July 2016(141)
- June 2016(149)
- May 2016(117)
- April 2016(59)
- March 2016(85)
- February 2016(153)
- December 2015(150)